belated references
use of thermal trap material for space heating of non-air conditioned buildings, J. Prakash & E. Carnevale (found on science direct)
performance prediction of two sloar water heaters using a thermal trap, Prakash & E. Carnevale (found on science direct)
infulence of the thermal trap material on teh performance of a roof as an inexpensive collector/storage system, G. N. Tiwari (found on science direct)]
energy citations database document #5066935
energy citations database document #6282908
thermal modeling of a natural convection solar water heating system with a thermal trap collector, N.K. Bansal; Sant Ram; R. Uhlemann, international journal of sustainable energy, volume 2, issue 5 1984, page 425-438
Sunday, March 28, 2010
Materials
ThermaWrap features a "Low-e metallized surface" that reflects infrared radiation. this contributes to the heating of the water in the pipes(reflects heat back up to the pipes) and a cooler interior environment. Thermawrap also purportedly has generates an R value of 2 when provided with a minimum of 3/4" air space. we may also be able to use this effect by suspending the ballast by 3/4", decreasing the r loss in the ballast from the pipes
here is the product page for tyvek ThermaWrap:
http://www2.dupont.com/Tyvek_Weatherization/en_US/products/commercial/comm_thermawrap.html
Cut Away of Proposed System and New References
Saturday, March 27, 2010
proposal
Re: Proposal to Research the Effectiveness of Utilizing Roof Rainwater as a Source of Greywater in Kamloops
Main Task: Reducing the Cost Of Hot Water Heating via Hot Water Recirc in Ballast Layer of IRMA Roofing Systems
Background: most passive water heating systems are expensive, pre built packaged units. This research looks at using copper hot water reirc piping above the insulation in IRMA roofing as an alternative
typical IRMA performance:
->heat ransmission through ballast
->thermal lag at insulation layer
->inside air temp
IRMA w/ HWR and reflective tyvek layer below pipes
->heat transmission through ballast
->heat relfected by tyvek
->thermal lag at insulation layer
->heat transmitted to HWR system
->inside air temp
Cost/Savings analysis of proposed system
->viable or not
resources:
EDDT 281 Building Services Theory, Walter Prescott, 2009
http://apps.carleton.edu/campus/sustainability/greenroof/assets/GreenRoofExpandedPress21.pdf
http://www.engineeringtoolbox.com/copper-pipe-heat-loss-d_19.html